SH 6 Super 2

Landtech was selected to prepare plans, specifications and estimates (PS&E) and related documents for the widening of SH 6 in Bosque County from the Hamilton County line to McLennan County line for a length of approximately 43-miles. This project is being completed for the TxDOT Waco District. The proposed project consist of converting a existing 2 lane rural section to a proposed Super 2 section. The PS&E will be developed into two separate construction packages with multiple CSJs.